Dark and Dated - This Master Bedroom Needed to Be Turned into a Suite....It was opened up and the closets moved from one side of the room to the other to allow a more open feeling.
There were two openings to the bathroom off the master which made no sense. Also note the ugly "Brady Bunch" retro 70's yellow Glass window by the entry.
The wall of closets has been removed from this wall and placed on the other side of the room.
BEFORE - Showing the 3 closets and the room right outside the Master bedroom to be incorporated into the area.
Opened Up - One of the doors to the bathroom has been sheet rocked and closed in...Note the URINAL in the bathroom, it was removed also.
Goodbye Ugly Yellow Plexi-Glass Window from the 70's...
New drywall installed and taped where the "extra" door to bathroom and window were.
Looking in towards room from entry.
As Completed - Closets were "Flipped" to The Other Side of the Room - New Recessed Directional Can Spot Lights Installed - Entry Opened Up , Now Flows into Room and Supplies more Sitting Space - New Entry to Master Bath, New Crown Molding and Base, Popcorn Ceiling Removed, New Soft Beige Paint and Carpet.
Commercial & Residential Property Repairs and Maintenance Licensed - Bonded - Insured Serving Property Managers, Real Estate Agents & Homeowners in Washington State Since 1992 206-510-9072 www.assetrenovation.com
Wednesday, December 10, 2008
Bedroom Remodel
Labels:
Base,
Bedroom,
Ceilings,
Contractor,
Crown Molding,
Drywall,
Entry,
Exterior Paint,
Lighting,
New,
Ocwen,
Recessed,
Trim,
WA
Monday, November 24, 2008
Slate "Rug" at Rear Entry - Stone Mosaic Design
Tuesday, November 18, 2008
Full Bathroom Remodel
New Corner Soaking Tub and Plumbing Installed. The Wonderful Antique Dresser Received New Hardware, and Was Then Painted Out (Top Stained in a Rich Dark Mahogany) and Plumbed For New (Kohler) Sink and Faucet.
Tile Entrance - Auburn Black Diamond Rd.
Front Entry - Auburn Black Diamond Rd.
BEFORE: Dated Front Porch at Main Entry to home - Aggragate Cement Landing, Simple (Dull) White 4x4 Support Posts - Very Plain. Mid - Job: Soffit Painted Out - 12" Slate Tiles Installed. Owner Wished to Retain The Retro 1960's Basalt Stone and Amber Colored Side Lite at Door.
AFTER: The Original 4x4 Posts Were Wrapped in Cedar and Trimmed Out With Simple Lines to Coordinate With Front Entry Doors Design. Slate tiles Were Sealed 2x Prior to Grout, and Then Sealed An Additional 3 times in the Following Week for Best Protection Against The Elements. The Cedar Received Clear Coats of UV Protectant Stain 3-4 Coats.
AFTER: The Original 4x4 Posts Were Wrapped in Cedar and Trimmed Out With Simple Lines to Coordinate With Front Entry Doors Design. Slate tiles Were Sealed 2x Prior to Grout, and Then Sealed An Additional 3 times in the Following Week for Best Protection Against The Elements. The Cedar Received Clear Coats of UV Protectant Stain 3-4 Coats.
Apartment Kitchen Remodel / Update
BEFORE: Dark and Very Dated Apartment Kitchen
AFTER: New Cabinets, Laminate Counter Tops, Wall & Ceiling Paint and Sheet Vinyl Flooring Installed. All Appliances (except exhaust hood over range) are Original to this Unit. A Truly Amazing Difference!
BEFORE: Kitchen of Same Unit - Sink Side AFTER: New Sink, Cabinets, Paint. Dishwasher is Original to Unit. NOTE: The "dark" pictures were taken in bright sunlight, and the "light, bright" pictures were taken at night! What a HUGE (and very cost effective) difference for this Apartment Managers Unit!
BEFORE: Kitchen of Same Unit - Sink Side AFTER: New Sink, Cabinets, Paint. Dishwasher is Original to Unit. NOTE: The "dark" pictures were taken in bright sunlight, and the "light, bright" pictures were taken at night! What a HUGE (and very cost effective) difference for this Apartment Managers Unit!
Log House - Slate Job - 3/4 Bath
Subscribe to:
Posts (Atom)